The objective of the addition’s office floors was to create adaptable, flexible, naturally lit, spaces that leverage the biophilic properties of mass timber to create high-quality, occupant centered spaces. Rendering by Norm Li.

Mass timber install of Level 4 NLT. NLT was laid in panels and spliced together on site. The pre-applied temporary membranes were completed with single piece tape lengths along splice lines.

Level 4 following column and Level 5 NLT installation.

Column base detail. The routered reveal was designed to leave a 15 mm gap between the top of the new concrete topping and the base of the column.

Reinforcing and services preparation for concrete topping.

Concrete topping in place.

Preparation of openings.

Glazing frames in place.

Precast concrete support angles in place.

Precast concrete band on support angle.

Brick installation following completion of precast concrete bands.

Brick installation in progress at Level 5.

Plan detail of brick pier at Level 5 where the piers are narrowest.

Facade progress complete to Level 5.

Core construction progress.

Core cladding progress.

Core cladding nearing completion.

Progress on the interior faces of the envelope as the finished space starts to come together.